New project for the District Headquarters of the State Fire Service in Cieszyn

PV installation with energy storage and reactive power compensation system!

We present our latest project: a 49.84 kW photovoltaic installation with a 49.2 kWh energy storage facility. The system was installed on a pile-driven structure with a 25° slope and a south-east orientation.

As part of the project:

  • we carried out the full design of the PV system and energy storage.
  • we installed an SVG device for reactive power compensation.
  • we carried out fire protection arrangements.
  • we integrated the system with the main fire safety switch.